Conrad LC30R -new construction trailer

restyled bogie for performance more suited to quarries and rough terrain.

A robust and even more manoeuvrable trolley:

  • three pneumatic wheels for easy towing;
  • wider base for maximum stability;
  • integrated rudder;
  • two integrated stabilisers;

These are the features of the new trolley included in the CANNONI-CONRAD fittings for CONRAD LC30R e LC50R.

Ideal for quarries, construction sites, demolition, material crushing sites, suitable for hauling beds even on uneven terrain.

Two LC50R units and one Phoenix Plus for dust control at a major aggregates plant in the Brescia area

How can dust be managed in a large crushing and screening plant? At a major plant for the crushing and screening of aggregates in the province of Brescia, dust control is a key factor both for the running of the plant and for quality

The C32 Fog Cannon in support of remediation work at railway construction sites

Demolition, site clearance and the removal of old railway infrastructure require particular attention to be paid to the management of dust released into the environment. For this reason, one of our clients, who specialises in railway construction projects, has chosen to expand its equipment fleet with a Cannoni-Conrad C32 mist cannon.

dust control on railway construction sites

Hydra 4.0 for railway construction sites: dust suppression during track rehabilitation works

Hydra 4.0 on railway construction sites: the smart solution for dust suppression during remediation works Remediation works along railway lines are among the most sensitive tasks in infrastructure management. The removal of contaminated material, excavation and demolition work inevitably generate

Request a quote