Cannons-Conrad at the International Concrete Days 2022 - Piacenza

Cannoni Conrad took part in the International Concrete Days 2022 in Piacenza, presenting solutions for dust control on construction sites, including models with PLC and remote management.

On 28, 29 and 30 April we will be present at the 4th edition of the INTERNATIONAL CONCRETE DAYS - GIC at the Piacenza exhibition centre 

We look forward to seeing you in Hall 1 at stand D45 to show you our dust suppression solutions together with our services:

  • SITE INSPECTION AND TEST
  • KIR INDUSTRY 4.0
  • HIRE
  • TECHNICAL ASSISTANCE
  • OPERATOR TRAINING

Two LC50R units and one Phoenix Plus for dust control at a major aggregates plant in the Brescia area

How can dust be managed in a large crushing and screening plant? At a major plant for the crushing and screening of aggregates in the province of Brescia, dust control is a key factor both for the running of the plant and for quality

The C32 Fog Cannon in support of remediation work at railway construction sites

Demolition, site clearance and the removal of old railway infrastructure require particular attention to be paid to the management of dust released into the environment. For this reason, one of our clients, who specialises in railway construction projects, has chosen to expand its equipment fleet with a Cannoni-Conrad C32 mist cannon.

dust control on railway construction sites

Hydra 4.0 for railway construction sites: dust suppression during track rehabilitation works

Hydra 4.0 on railway construction sites: the smart solution for dust suppression during remediation works Remediation works along railway lines are among the most sensitive tasks in infrastructure management. The removal of contaminated material, excavation and demolition work inevitably generate

Request a quote