Conrad C42 installed in a Modena Ceramic Works

CONRAD C42 fixed on a 12 m high wall to reduce dust in a loading area of a Ceramics factory in Modena - Italy

Other Articles

https://youtu.be/pc2RGf1BggI At the Cuneo composting site, we installed a dust suppression cannon in the material loading area. The...

https://youtu.be/95Sv54KYNfI This atomising line is designed to contain the dust raised during material handling. The system...

At this waste recycling plant located in the Venice area, we supplied a spraying system that was placed...

The 32nd Assodimi Assonolo National Congress for Distributors and Hirers will be held on 11 October at Lingotto Fiere in Turin...

5-8 November 2024 Ecomondo, the leading annual event in the green and circular economy sectors, is the meeting point between...

Automatically triggered stationary spraying plant This curtain spraying plant we installed on a rotating screen...

Call us